EVS accusation | Assets from an EV manufacturer available at auction – manufacturing equipment test, 3D and more

Maynards Group will hold an auction, evaluation and financing auction of assets from the failed EV company (Maynards do not name any names, but we believe that the Fantastic Four Superhero team can provide an idea). The auction will be held online at 10:00 am Pacific time on April 10. The assets are located in […]
EVS accusation | EV Engineering Seminar schedule on Thursday: 13 March 2025

Charmed this week hosts a virtual conference on EV Engineering for free to attend. The conference includes a live symposium sessions with the interactive Q&S and web seminars. View the daily session schedule online here. All live sessions will be recorded and available for display after broadcasting. The recorded videos can be accessed on the […]
EVS accusation | Measuring voltage and current in EV systems with evolutionary stereotypes (online seminar)

Join the web symposium at our virtual conference in March on EV Engineering, presented by CSM, where we will provide practical visions to help you improve your test strategies, accelerate compliance, and provide more strong products to the market. Book your place – it’s free! Other sessions include the following virtual conference: EV (MCU) control […]
EVS accusation | Video: Heavy Equipment Electrical – 580EV 580EV

In a recent interview with Charge, Brad Stib, Brady Lewis, and George Macintier pushed the company towards electricity in heavy equipment, with a focus specifically on 580ev Electric Backhoe. The conversation explored the development process, performance comparisons, industry adoption, and the future effects of electricity in the construction sector. One of the main fast food […]
EVS accusation | Stardust Power begins building a Li -Time Cross for the US Battery

Stardust Power, a developer of the United States -based Lithium products, cleared it on building a Li -Toma refinery in the Southside Industrial Park in Moskogy, Oklahoma. The project will be developed in two phases. The first stage will focus on building a production line capable of producing up to 25,000 metric tons annually. The […]